SSTS Permitting Sandbox site
Compliance Inspection Compliance Inspection Compliance Inspection # CI-2017-0879, Submission # Submission-2017-0914, UID # 9907
Status: Compliance Inspection Accepted
Status: Compliance Inspection Accepted
System Status
System status on date: | 08/03/2017 | System Status: | Compliant |
Property Information
Property Information: | |||||||||||||||||
Owner's representative: |
|
Impact on Public Health
System discharges sewage to the ground surface: |
No | System discharges sewage to drain tile or surface waters: |
No | System causes sewage backup into dwelling or establishment: |
No |
Verification method(s): | Searched for surface outlet Searched for seeping in yard/backup into home Excessive ponding in soil system/D-boxes |
Tank Integrity
System consists of seepage pit, cesspool, drywell, or leaching pit: |
No |
Sewage tank(s) leak below their designed operating depth: |
No |
Verification method(s): | Probed tank(s) bottom |
Other Compliance Conditions
Maintenance hole covers are damaged, cracked, unsecured, or appear to be structurally unsound: |
No |
Other issues (electrical hazards, etc.) to immediately and adversely impact public health or safety: |
No |
System is non protective of groundwater for other conditions as determined by the inspector: |
No |
Date of Install
Date of install known: | No |
Soil Separation
Shoreland/Wellhead Protection/Food, beverage, lodging? | No |
Drainfield has at least a three-foot vertical separation distance from periodically saturated soil or bedrock.: |
Yes |
Drainfield meets the designed vertical separation distance from periodically saturated soil or bedrock.: |
No |
Verification method(s): | Conducted soil observation(s) (Attach boring logs) |
Comments/Explanation: | see report |
A. Bottom of distribution media: | 36 Decimal Feet |
B. Periodically saturated soil/bedrock: | 0 Decimal Feet |
C. System separation: | 30 Decimal Feet |
D. Required compliance separation: | 24 Decimal Feet |
Operating Permit and Nitrogen BMP
Is system operating under an Operating Permit: | No |
Is the system required to employ Nitrogen BMP: | No |
Comments and File Attachments
Comments or recommendations: | 1200 gallon septic tank & 1000gallon pump tanks (estimated) lifting to gravity drainfield |
Attach Files: |
|
Certification
Inspector: |
Please search for and choose SELF/OTHER if what you need does not appear in the list
|
Inspector Email Address: | tomtrooien@aol.com |
Terms
Certification
By submitting this form I hereby certify that all the necessary information has been gathered to determine the compliance status of this system. No determination of the future
system performance has been nor can be made due to unknown conditions during system construction, possible abuse of the system, inadequate
maintenance, or future water usage
Invoice #2453 (08/08/2017)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 08/08/2017 3:00 PM $40 Flat Fee |
$40.00 | x 1 | $40.00 |
Grand Total | |||
Total | $40.00 | ||
Payment 08/08/2017 | $40.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Tom Trooien - 08/23/2017 9:38 AM - witnessed by Kati Hallermann df7799bd9836ea54380bbed110ceb2fa a85558ce6348b4cd9780a0ddf496d960 |
#1 Compliance Inspection Accepted | Kati Hallermann - 08/23/2017 9:38 AM 39ab9755c58b5d7b467de6dd7b61c3e4 23c174dbd152711fe9fba0d10288ae27 |
Inspection has been approved. All signatures have been obtained.
Public Notes
Text: | |
File(s): |
Internal Notes
Text: | |
File(s): |